• Hot Sale Factory Price American Code Steel Building Parts
  • Hot Sale Factory Price American Code Steel Building Parts
  • Hot Sale Factory Price American Code Steel Building Parts

Hot Sale Factory Price American Code Steel Building Parts

Material: Steel Structure
Usage: Warehouse, Temporary Offices, Workshop
Certification: ISO, CE
Customized: Customized
Main Structure: Welded H Section,Lattice Structure,Tubular Column
Wall and Roof Sandwich Panel: EPS, Rock Wool, Glass Wool, PU
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
736
Service Offered
Design, Fabrication, Packing, Transport, Erection
Design Parameter
Wind Load, Snow Load and Earthquake
Surface Treatment
Painted with Jotun
Transport Package
by Steel Frame Bundled in Bulk Ship, by Pallet Int
Origin
China
HS Code
7308900000
Production Capacity
3000 Ton/Tons Per Week

Product Description

Hot Sale Factory Price American Code Steel Building Parts
Hot Sale Factory Price American Code Steel Building Parts
1. components
and materials of the steel building parts ( made of steel frame ) :
Main structure Welded H section , Lattice structure , Tubular column or beam , space frame etc
Purlin C Section Channel or Z Section Channel
Roof Cladding Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil
Wall Cladding Sandwich Panel or Corrugated Steel Sheet
Tie Rod Circular Steel Tube
Brace Round Bar
Column & Transverse Brace Angle Steel or H Section Steel or Steel Pipe
Knee Brace Angle Steel
Roof Gutter Color Steel Sheet
Rainspout PVC Pipe
Door Sliding Sandwich Panel Door or Metal Door
Windows PVC/Plastic Steel/Aluminum Alloy Window
Connecting High Strength Bolts
Packing Decided by you , loaded into 1X 40ft GP , 1X20 ft GP , 1X40 ft HQ
Drawing We can make the design and quotation according to your require or your drawing

2. Who we are:
We are an integrated and professional steel building & steel structure provider in Shandong China. Specialized in the fields of steel structure building manufacturing and international business, Based the principle of sincerity, credit, mutual benefit and rich resources from China we have provided best quality products and value-adding service to customers for more than 15 years. As return, we won top reputation and established long-term business relation with customers from more than 50 countries and regions. Our customers are very satisfied with our good reputation, efficient working system, good service for resourcing, inspection, loading, installation guidance and claim solving.
Our top serviced client include SIEMENS, GE, India Adani Power, Hyundai Steel etc.
Hot Sale Factory Price American Code Steel Building Parts
Hot Sale Factory Price American Code Steel Building Parts
Hot Sale Factory Price American Code Steel Building Parts
3. Project case- AIRCRAFT HANGAR IN IRAN( 2013) :

The aircraft hangar in IRAN takes up 69M* 32M square meters with partial second floor. The eave height is 7.5meter, span is 32 meter. Drainage slope is 5% .
Main steel structure: welded H steel;
Purlin: cold-rolled C section steel;
Cladding: color steel sheet with foil insulation on roof and glass wool sandwich panels.
Hot Sale Factory Price American Code Steel Building Parts
Hot Sale Factory Price American Code Steel Building Parts
4. What you can get from us for your demanded steel building parts ( made of steel frame ) :
1) Steel structure special designing and processing
2) EPS sandwich panel( for wall, roof, floor)
3) All construction & decoration materials &downpipe are strictly selected.
4) Designing & Installation drawings( in details)
5) Full support in installation technology & guidance
6) Engineers' guidance on-site in your place is available
7) Custom-made service is available
Hot Sale Factory Price American Code Steel Building Parts
5. The Advantage of the steel building parts ( made of steel frame ) :
1) Weight is lighter
2) Working reliability is higher
3) Excellent anti-shock and anti-impact ability
4) High degree of industrialization
5) an be assembled accurately and rapidly
6) Interior space is large
7) Easy to make seal structure
8) Recyclable
9) Construction period shorter

6. FAQ:
1) How about the delivery time of the steel building parts ( made of steel frame ) ?
Reply: Usually, 5000SQM or 800tons steel building within 45-60 days after the order confirmed, also depends on the fabrication quantity.

2) What makes you different from other manufacturers ?
We believe our service department has the experience and knowledge to safely service your need for structural steel construction, such as industrial workshop, light steel warehouse, container house, steel building parts ( made of steel frame ). We have trained service technicians who will be able to help your erection, and have been providing our customer's an effective service solution.

3) Can I customize my steel building parts ( made of steel frame ) ?
Answer: We have as a wide variety of finishes and features that will satisfy your personal taste and needs. Please contact our sales to explain some detail you want to customize the warehouse.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now