Shandong, China
Business Type:
Manufacturer/Factory
Registered Capital:
16000000 USD
Plant Area:
>2000 square meters
Management System Certification:
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001
Average Lead Time:
Peak season lead time: 1-3 months
Off season lead time: one month
OEM/ODM Service

Butler Steel Buildings, Clearance Steel Buildings, Coastal Steel Buildings manufacturer / supplier in China, offering Suitable Price Sound Insulation Clearance Steel Buildings, Portal Frame Steel Structure Steel Warehouse, Q345 Design Industrial New Design Heavy Steel and so on.

Diamond Member Since 2019
Audited Supplier
Supplier Homepage Products steel frame buildings Suitable Price Sound Insulation Clearance Steel Buildings

Suitable Price Sound Insulation Clearance Steel Buildings

Get Latest Price
Min. Order / Reference FOB Price
100 Tons US $800-1,200/ Ton
Port: Qingdao, China
Production Capacity: 10000 Ton/Tons Per Month
Payment Terms: L/C, T/T
Material: Steel Structure
Usage: Warehouse, Temporary Offices, Workshop
Certification: ISO, CE
Customized: Customized
Software Used: Autocad 3D3s Pkpm Tekla
Design Parameter: Wind Load, Snow Load and Earthquake

You Might Also Like

Loading...

Basic Info

Model NO.
1465
Design& Quote
We Can Make Design and Quotation According to Your
Specifications
Main Steel: Q345b, Q235B Column&Beam: Welded or Ho
Surface Treatment
Painted with International Paint
Transport Package
Container or Bulk Ship
Origin
China
HS Code
7308900000
Suitable Price Sound Insulation Clearance Steel Buildings
Suitable Price Sound Insulation Clearance Steel Buildings

1. Products description for the clearance steel buildings ( made of steel frame ) :
Main Steel
Steel Beam ColumnQ235B , Q345B
Secondary Steel
Tie BarQ235B
PurlinC and Z purlin
BracingQ235B
Accessories
SurfacePainted or Hot Dip Galvanized
DoorRolling Up Door or Sliding Door
WindowPVC or Aluminum Alloy
Roof and Wall PanelsCorrugated Steel Sheet , EPS Sandwich Panel , Rock Wool Sandwich 
Panel , PU Sandwich Panel
Others
ServiceDesign , Fabrication and Installation
We can offer quotations according to customers' drawings and requirements , free design drawings and detailed installation drawings .
Design software :  Auto CAD , PKPM , MTS , 3D3S , TArch , Tekla Structures ( X steel ) V12.0 , etc
Packingmain steel frame with 40 OT 
roof and panel load in 40 HQ 
Or According To Customer Requirement


2. About us:
Have you ever experienced Complicated & Tedious to communicate with many of different factories for your wide range products demand for your projects? Are you tired and bored with your suppliers after the order confirmed? No worries. We can help you to solve all these problems. You only need to sit in your office. All of the other things hand over to us.
We are one Stop Shop for all of your steel building materials. We offer various types of steel structure, steel building, workshop, steel warehouse etc at competitive price.

We have been in the building field for more than 10 years earned our reputation as one of the Chinese's leading suppliers of construction metal products. We mainly worked with the Developer, Contractor, Designer and the Architect. In the following famous projects we are all involved as VIP supplier: Shanghai World Expo, Shanghai Disney Resort, South Korean Hyundai Steel Project 2950T.

We have our own Design Team and Quality Control Center. You only need send us your projects' Plan drawings then we make the solutions for you.

Suitable Price Sound Insulation Clearance Steel Buildings
Suitable Price Sound Insulation Clearance Steel Buildings
Suitable Price Sound Insulation Clearance Steel Buildings

3. Project case- Congo Steel Sheet Making Factory project, 2016:
Project Overview:
Beam & Column structure with large span curved cellular rafters. Package included structural steel work, stairs, balustrading and steel decking.
Main Contractor: MAPA Group
Engineer: Five Consulting Engineers
Tonnage: 2800
Completion Date: 2016

Due to the tight schedule of this project, to save the time and improve the container delivery efficiency, we use our container stuffing  equipment from Germany, which could make us finish one 40 feet container stuffing within 2 minutes. The client and owner are all surprised to see our container stuffing system. What is more important and make them amazing, the goods are 100% brand new and without any damage after reach to project site. This help the owner get many prize from the local government.

Suitable Price Sound Insulation Clearance Steel Buildings
Suitable Price Sound Insulation Clearance Steel Buildings


4. Our design and dwgs detailing Strengths on clearance steel buildings ( made of steel frame ) :
The total numbers of our engineer and technicians reaches to 90, which is 10% of total company employees, who all are working on structural design, connection design, value engineering, shop drawing, simulating analysis of construction, BIM modeling with AISC, EN, AS, JIS and GB. Now our design team could deal with design of all kinds of common steel structure, steel workshop, warehouse, high rise building, industrial complicated structure, clearance steel buildings ( made of steel frame ) etc.
Suitable Price Sound Insulation Clearance Steel Buildings


5. Packaging & Shipping for clearance steel buildings ( made of steel frame ) :
1) Using container:
container of 20 feet, and container of 40 feet
2) By sea for batch goods, for container or bulk-cargo ship, port receiving.
3) Customers specifying freight forwarder or negotiable shipping methods
4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.
6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.
7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.


6. FAQ:
1) Q: How long is your delivery time for clearance steel buildings ( made of steel frame ) ?
A: Generally it is within 15-30 days after get the deposit and final drawing, definitely according to quantity and your requirements of clearance steel buildings ( made of steel frame ).

2) Q: What is the colors of your sandwich panels usually used ?
A: Off-white, ivory white, blue, green and red color.

3) Q: How can I get the quotation of the project ?
A: If you have drawing, we can offer you the quotation as per your dwgs. If you have no design, Our engineer make your idea to real warehouse and will design some drawings for you to confirm. And then offer you a quotation under your material demand and drawing.


 

Send your message to this supplier

*From:
*To:
avatar Ms. Tracy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now