• Australia Standard Save Maintainance Cost Modern Metal Buildings
  • Australia Standard Save Maintainance Cost Modern Metal Buildings
  • Australia Standard Save Maintainance Cost Modern Metal Buildings

Australia Standard Save Maintainance Cost Modern Metal Buildings

Material: Steel Structure
Usage: Warehouse, Temporary Offices, Workshop
Certification: ISO, CE
Customized: Customized
Design& Quote: We Can Make Design and Quotation According to Your
Main Structure: Welded H Section,Lattice Structure,Tubular Column
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
1375
Process Standard
ISO Standard GB Standard Japanese Industrial Stand
Software Used
Autocad 3D3s Pkpm Tekla
Quality Control
The Third Party, SGS, Asia Inspection All Accept
Transport Package
Container
Origin
China
HS Code
7308900000
Production Capacity
10000 Ton/Tons Per Month

Product Description

Australia Standard Save Maintainance Cost Modern Metal Buildings
Australia Standard Save Maintainance Cost Modern Metal Buildings


1. Data of the modern metal buildings ( made of steel frame ) :
Specification
Material : Grade Q235 , equivalent to ASTM A36
Grade Q345 , equivalent to ASTM A572
Section : Any product shape according to customer's requirements
Certification : ISO quality system , Chinese GB50221 - 2001
Sand Blast : SA 2.5 Sand blasting
Welding Technology : Single level butt welding , fillet welding by electric arc welding 
and Gas shielded welding
Surface treatment : Hot dip galvanized , Epoxy zinc rich primer
Standard : ISO1461 ( 1999 ) , JIS H 8641 - 1999 , ASTM A 123 / A 123M-02
Welding Testing Ultrasonic Testing , X-ray Testing
Manufacturing Technology Drilling , Cutting , Assembling , Welding , Rectification , Testing etc



2. Our Factory:
We were founded and located in Shandong Province, China. We have fixed assets of 180 million RMB and a workshop plant area of more than 200, 000 Square meters. Our manufacturing base covers 360, 000 square meters. In addition, we have more than 960 employees, including 110 intermediate and senior technical staff members. Besides, we have our own installation and construction teams. We also have abundant financial resources and advanced equipment, including H-TYPE and BOX-TYPE steel structure production lines, full-range impeller blasting equipment, production lines of rack and truss, C-TYPE and Z-TYPE steel forming machines, various kinds of machine tools, drilling machines, folding machines and physical and chemical detection equipment.
Australia Standard Save Maintainance Cost Modern Metal Buildings
Australia Standard Save Maintainance Cost Modern Metal Buildings
Australia Standard Save Maintainance Cost Modern Metal Buildings

3. Some of OUR WORKSHOP/ WAREHOUSE PROJECTS:

1) AREVA Transformer Factory Project:
Covering an area totaled 33, 842 sq.m, the program consumed steel in 4299 tons, the column height is 31-33 m, and the inside is installed with the bunk bed traveling crane with the maximum hoisting capacity in 400 tons.
2) NEW ZEALAND Barns / Grain Warehouses:
light gauge steel structure with cold bended profiles.
3) BOLIVIA Cement Plant:
Steel consumption: 3, 655 tons in the first phase, 7200 tons in the second phase.
4) LDK Polysilicon Public Project:
Was generally contracted by FLR CO., LTD, the total steel consumption volume for Phase I project reached over 3000 tons and this program was in a high-rise steel structure of 4-7 floors.
Australia Standard Save Maintainance Cost Modern Metal Buildings
Australia Standard Save Maintainance Cost Modern Metal Buildings


4. Urgent delivery to meet client' s urgent requirement on modern metal buildings ( made of steel frame ) :
Do you need a modern metal buildings ( made of steel frame ) FAST ?
A number of our standard steel workshop or warehouse models can ship within 30 days! Depending on the size and complexity, preliminary drawings for your approval and stamped engineer drawings for permits will be generated within days.
Australia Standard Save Maintainance Cost Modern Metal Buildings

5. Advantage of our product modern metal buildings ( made of steel frame ) :
1) Speed of construction due to in plant fabrication, tight construction tolerances, and minimum site wastage
2) Lower project cost, compared to conventional construction materials
3) Limitless Aesthetic possibilities can be shaped in any form
4) Design flexibility for any application
5) High strength to weight ratio
6) Ease of design
7) Sustainable
8) Modifiable / expandable.
9) Space Efficient due to larger spans and efficient member sizes
10) Readily available for Projects anywhere in the world



6. FAQ:
1) Is there a clear service life of your modern metal buildings ( made of steel frame ) ? If have, how long ?
Under conventional climate and environment, steel structure whole building 30 years, main structure 50 years, protecting system 30 years.

2) What designs do you have in different climates? How can the modern metal buildings ( made of steel frame ) adopt to different climates?
Strong wind region: improve the wind-resisting ability of the internal structure.
Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.
High corrosion region: use corrosion resistant material, or paint anti-corrosive coating.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now